# Day rate vs hourly for a 2-week job: price safely

> Choose between day rate and hourly for a two-week brand job using your real time, review cycles, and a week-1 safety buffer—then price confidently with Qufy.

- Canonical: https://beta.qufy.app/blog/day-rate-vs-hourly-for-two-week-brand-job
- Date: 2026-10-16
- Updated: 2026-10-16
- Category: rate
- Tool: https://beta.qufy.app/rate
- Keywords: day rate vs hourly, two week brand project pricing, how to avoid underquoting, freelance rate calculator, scope creep pricing, brand design hourly rate

## Takeaways
- Convert your real weekly hours into a day rate (not a guess), then add a week-1 buffer for reviews.
- If the client is still defining deliverables, prefer hourly or a day rate with clear outputs and revision limits.
- Use Qufy’s rate calculator to produce one defensible number you can explain in writing.

## Quick decision frame before you calculate anything

A two-week brand job has one risk that repeatable pricing must handle: week 1 is where scope usually clarifies (or expands). If you only price “average production hours,” you can underquote immediately and still be working hard in days 3–7.

Your job is to choose a pricing model that matches how deliverables and feedback behave. Day rate works when outputs are defined and the workflow rhythm is stable. Hourly works when the client is still exploring, approving, or adjusting direction.

- If “done” is clear and revisions are limited → start with day rate.
- If deliverables are still fluid or approvals are delayed → start with hourly.

| What is uncertain | Best first week model |
| --- | --- |
| Exact deliverables (logos only vs full identity) | Hourly until deliverables lock |
| Feedback cadence and revision limits | Day rate with revision caps |
| Approval speed from decision-makers | Hourly or day rate with clear windows |

## Why underquoting happens in week 1 (and how to stop it)

Week 1 contains hidden tasks you may not count when you estimate your “hourly rate.” These include client onboarding, reviewing brand references, setting up templates, organizing assets, preparing first drafts, and then doing the first meaningful revision after feedback returns.

Underquoting usually happens for one of three reasons: (1) you price only for production, not for waiting time and iteration; (2) you ignore revision rounds; or (3) you convert hourly to day rate with too few working hours per day.

A reliable fix is to add a week-1 buffer. That buffer can be time (extra hours you reserve) or scope (a limit you state clearly). You don’t need to overcomplicate it; you need to make the risk visible in your quote.

- Buffer with time: plan 1 extra review/iteration hour per week for setup + first feedback.
- Buffer with scope: cap revisions (e.g., 2 rounds) and define what counts as a revision.

1. Write the week-1 assumption in one sentence (e.g., “Week 1 includes onboarding, first drafts, and 1 revision round”).
2. Decide what happens if feedback arrives late (hourly continues, or day rate applies only during agreed feedback windows).

| Pricing choice | What it protects | How to phrase it to the client |
| --- | --- | --- |
| Week-1 buffer hours (time) | Extra setup + first iteration | “Included: onboarding + first draft + 1 revision round in week 1.” |
| Revision caps (scope) | Feedback cycles that multiply | “2 rounds of revisions per deliverable; additional rounds are billed separately.” |
| Hourly fallback for unclear deliverables | Scope changes before direction locks | “Day rate applies once deliverables are confirmed; otherwise hourly until lock.” |

## Day rate vs hourly: choose based on certainty and review cycles

Day rate is simple for clients: one number per workday. It also signals availability and continuity. But it only works well when you can define outputs and limit revisions—otherwise the day rate turns into an open-ended commitment.

Hourly is flexible and honest when you expect exploration. It is also safer when approvals are slow because you can still track your real time spent. The downside is that clients may ask for frequent updates and want you to “keep going” whenever they add tasks.

- Use day rate when: deliverables are listed, feedback rounds are agreed, and timing is stable.
- Use hourly when: deliverables, direction, or approval timing may change week 1.

1. Draft your outputs list first (deliverables + file types + format expectations).
2. Add a revision rule next (e.g., “2 rounds per deliverable, then hourly for additional rounds”).
3. Now choose: day rate for stability, hourly for uncertainty.

| Factor | Day rate fits best | Hourly fits best |
| --- | --- | --- |
| Deliverable list | Defined up front | Still being finalized |
| Revision rounds | Capped and agreed | Unclear or likely to change |
| Approval speed | Expected within set windows | May slip and cause idle time |
| Client add-ons | Handled as extras with clear pricing | Added tasks can be tracked |

## How to compute a day rate from your hourly base (with a week-1 buffer)

If you already know your hourly base, a day rate is not “hourly × random hours.” You need a realistic number of billable hours per day and you need to account for setup and iteration. For a brand job, the non-creative time (brief review, asset prep, revision implementation) is real.

Start from your billable hours per workday (for example, 5 to 6 billable hours, depending on your workflow and how meetings are handled). Then add a week-1 buffer so that the first feedback cycle is not eating your margin.

- If the client insists on “7 full days,” ask how many are actually working days and how feedback windows are scheduled.

1. Pick your billable hours/day based on how you work (and where meetings land).
2. Run your hourly base through Qufy’s rate calculator to get a defendable number.
3. Create a week-1 statement: what is included, what is capped, and what triggers extra billing.

| Question | If yes, you can use day rate |
| --- | --- |
| Are deliverables listed and prioritized? | You can cap revisions and define “done.” |
| Do you have a planned feedback cadence? | You can align day rate with work windows. |
| If feedback slips, does the contract allow hourly add-ons? | You won’t eat margin for delays. |

## An ordered quote process you can reuse (quote → invoice → follow-up)

For a two-week brand job, speed matters—but only after your pricing logic is locked. The following sequence keeps week-1 risk visible and makes invoicing predictable.

- If the client requests a “discount” for committing to a fixed day rate, ask for revision caps and an explicit list of exclusions instead of reducing your base rate without boundaries.

1. Collect a short brief: deliverables, target formats, and number of revision rounds you can commit to.
2. Choose pricing model: day rate with revision caps for stable workflow, or hourly for fluid direction.
3. Use Qufy rate calculator to generate one defensible number for your quote.
4. Write the week-1 inclusion rule (one sentence) and the trigger for extra billing.
5. Generate your invoice PDF using Qufy and show payment details tied to the chosen invoice structure.
6. Set reminders and send them to the client when the due date approaches.

| Item in your quote | Day rate version | Hourly version |
| --- | --- | --- |
| Scope statement | Deliverables + revision cap define “done.” | Deliverables are working targets; time tracks real effort. |
| Client feedback windows | Aligned to days included in your rate. | Aligned to hours worked, even if feedback timing shifts. |
| How add-ons are priced | Extras priced per deliverable or per extra revision. | Added tasks billed at hourly, with a clear log rule. |

## Use Qufy to keep your rate consistent across two weeks

A two-week project often means your work changes slightly day to day. Qufy helps you keep your pricing logic consistent by starting from a rate you can defend, then turning it into quotes and invoices with clear payment details.

You can also speed up quoting by starting with a WhatsApp brief, then refine deliverables and revision limits before you send the client your written quote.

- Rate calculator: set one defensible number you can explain in writing.
- Quotes and share links: send the offer quickly, then align deliverables and revisions before work starts.
- Invoices PDF: confirm payment details on the chosen invoice structure.
- Time tracking: track on the web or using the Mac timer so your week-1 buffer is grounded in real effort.

1. If you chose day rate: define revision caps and exclusions, then invoice per your agreed schedule.
2. If you chose hourly: track time during week 1 and confirm scope; invoice with payment details tied to tracked hours.

## Checklist for a non-controversial 2-week scope (paste into your quote)

Before you pick day rate or hourly, make “done” measurable. The items below reduce debates during week 2 and protect your first-week margin.

- Deliverables: list them plainly (e.g., logo concepts, brand colors, social templates, style guide pages).
- Revisions: specify number of rounds per deliverable and what counts as a revision.
- Feedback windows: state when you expect feedback and how long you have to implement it.
- Exclusions: new direction changes, extra concepts, or additional formats beyond the agreed list.
- Payment schedule: due dates and what triggers the next invoice (midpoint deliverable, final delivery, etc.).

| Clause goal | Day rate wording | Hourly wording |
| --- | --- | --- |
| Define week-1 scope | “Week 1 covers onboarding, first drafts, and 1 revision round.” | “Week 1 includes discovery and drafting; time is tracked until deliverables are confirmed.” |
| Handle extra revisions | “Additional revision rounds are billed as extras.” | “Additional changes are billed by the hour based on logged time.” |
| Manage unclear deliverables | “Day rate applies after deliverables are locked; before that, hourly may apply.” | “Deliverables evolve; pricing reflects time spent until approval milestones.” |

## FAQ

### Should I quote a day rate or hourly for a two-week brand job?

Use a day rate when the deliverables and revision cycles are clear and the work rhythm is stable. Use hourly when the scope may change daily or the client is still defining what “done” looks like.

### How do I avoid underquoting in the first week?

Price for the reality of kickoff: discovery, file setup, and the first round of feedback often take longer than your “average hour.” Add a week-1 buffer or choose an hourly structure until scope is confirmed.

### What should I include in a day-rate quote for brand work?

Include the number of deliverables, the maximum revision rounds per deliverable, and the communication cadence (for example, one feedback window per day). Also specify what is excluded (new direction changes, extra concepts, extra file types).

### When is hourly better than day rate for branding?

Hourly is better when you expect exploratory work, approvals that take time, or shifting priorities. It helps you keep the quote honest while the client locks in direction and the project scope stabilizes.

### Can I quote a day rate and switch to hourly later?

Yes, if you write it as a clear condition. For example: day rate for week 1 to cover setup and first drafts, then hourly for add-ons or extra revisions after agreed deliverables are locked.

**Calculate your defensible rate in Qufy:** https://beta.qufy.app/rate


---

# معدل اليوم أم بالساعة لوظيفة علامة لمدة أسبوعين: اختر بثقة دون تقليل السعر

> اختر بين معدل اليوم والأجر بالساعة لوظيفة علامة لمدة أسبوعين باحتساب وقتك الحقيقي ودورات المراجعة وهامش أمان للأسبوع الأول—ثم احسب بسلاسة في Qufy.

- Canonical: https://beta.qufy.app/blog/day-rate-vs-hourly-for-two-week-brand-job
- Date: 2026-10-16
- Updated: 2026-10-16
- Category: rate
- Tool: https://beta.qufy.app/rate
- Keywords: معدل اليوم مقابل بالساعة, تسعير مشروع علامة أسبوعين, كيف أتجنب تقليل السعر, حاسبة معدل المستقل, تسعير تمدد نطاق العمل, معدل تصميم علامة بالساعة

## الخلاصات
- حوّل ساعاتك الفعلية أسبوعيًا إلى معدل يوم (لا تخمين)، ثم أضف هامش أمان للأسبوع الأول للمراجعات.
- إذا كان العميل ما يزال يوضح مخرجاته، فاختر الأجر بالساعة أو معدل يوم مع مخرجات واضحة وحدود مراجعات.
- استخدم حاسبة المعدلات في Qufy لإخراج رقم واحد يمكن الدفاع عنه وشرحه كتابة.

## إطار قرار سريع قبل أي حساب

أي وظيفة علامة لمدة أسبوعين فيها مخاطر لا بد أن تتعامل معها أي تسعيرة قابلة للتكرار: الأسبوع الأول هو وقت توضيح النطاق (أو تمدده). إذا سعّرت فقط “ساعات الإنتاج المتوسطة”، فقد تقلل السعر من البداية وتجد نفسك ما تزال تعمل بقوة في الأيام 3–7.

مهمتك هي اختيار نموذج تسعير يطابق سلوك المخرجات والملاحظات. معدل اليوم يناسب عندما تكون المخرجات محددة والإيقاع ثابت. أما بالساعة فمناسب عندما يكون العميل ما يزال يستكشف أو يعتمد أو يعدل اتجاه العمل.

- إذا كان “الإتمام” واضحًا والمراجعات محدودة → ابدأ بمعدل يوم.
- إذا كانت المخرجات غير ثابتة أو الموافقات قد تتأخر → ابدأ بالساعة.

| ما الذي غير مؤكد | أفضل نموذج لأول أسبوع |
| --- | --- |
| المخرجات الدقيقة (شعار فقط أم هوية كاملة) | بالساعة إلى أن يثبت النطاق |
| وتيرة الملاحظات وحدود المراجعة | معدل يوم مع سقف للمراجعات |
| سرعة الموافقة من صانعي القرار | بالساعة أو معدل يوم مع نوافذ واضحة |

## لماذا يحدث تقليل السعر في الأسبوع الأول (وكيف توقفه)

الأسبوع الأول يحتوي على مهام مخفية قد لا تحتسبها عندما تقدّر “معدل الساعة”. مثل استقبال العميل، مراجعة مراجع الهوية، تجهيز القوالب، تنظيم الملفات، إعداد المسودات الأولى، ثم تنفيذ المراجعة الفعلية الأولى بعد وصول الملاحظات.

تقليل السعر عادة يحدث لواحد من ثلاثة أسباب: (1) تسعّر فقط للإنجاز وليس للتكرار والانتظار؛ (2) تتجاهل عدد جولات المراجعة؛ أو (3) تحوّل بالساعة إلى معدل يوم بساعات عمل يومية قليلة.

الحل الأكثر موثوقية هو إضافة هامش أمان للأسبوع الأول. يمكن أن يكون هامشًا زمنيًا (ساعات إضافية تحجزها) أو هامشًا في النطاق (حد تذكره بوضوح). لا تحتاج لتعقيد، بل تحتاج أن تجعل الخطر ظاهرًا في عرضك.

- هامش زمني: خطط ساعة إضافية للمراجعة/التكرار لكل أسبوع بسبب التجهيز والملاحظات الأولى.
- هامش بنطاق: ضع سقفًا للمراجعات (مثل 2 جولة) وحدد ما الذي يُحسب كمراجعة.

1. اكتب افتراض الأسبوع الأول بجملة واحدة (مثل: “يشمل الأسبوع الأول استقبال العمل وإخراج المسودات الأولى وجولة مراجعة واحدة”).
2. حدد ماذا يحدث إذا وصلت الملاحظات متأخرة (العمل يكمل بالساعة، أو أن معدل اليوم ينطبق فقط ضمن نوافذ ملاحظات متفق عليها).

| اختيار التسعير | ما الذي يحميك | كيف تصيغها مع العميل |
| --- | --- | --- |
| ساعات هامش للأسبوع الأول (زمن) | التجهيز الإضافي + التكرار الأول | “مشمول: استقبال العمل + المسودة الأولى + 1 جولة مراجعة في الأسبوع الأول.” |
| سقف للمراجعات (نطاق) | تضخم دورات الملاحظات | “جولتان مراجعة لكل مخرجات؛ الجولات الإضافية تُفوتر منفصلة.” |
| تحويل إلى بالساعة عند عدم وضوح المخرجات | تغيّر النطاق قبل تثبيت الاتجاه | “ينطبق معدل اليوم بعد تأكيد المخرجات؛ وإلا نعمل بالساعة حتى التثبيت.” |

## معدل اليوم مقابل بالساعة: اختر حسب وضوح النطاق ودورات المراجعة

معدل اليوم سهل على العملاء: رقم واحد لكل يوم عمل. كما أنه يعبّر عن الاستمرارية والتوفر. لكن نجاحه يعتمد على قدرتك على تعريف المخرجات وتحديد حدود المراجعة—وإلا سيتحوّل معدل اليوم إلى التزام مفتوح بلا نهاية.

التسعير بالساعة مرن ومنصف عندما تتوقع استكشافًا. وهو أيضًا أكثر أمانًا عندما تكون الموافقات بطيئة لأنك تستطيع تتبع وقتك الحقيقي. الجانب السلبي هو أن بعض العملاء قد يطلبون تحديثات كثيرة ويريدون منك الاستمرار كلما أضافوا مهمة.

- استخدم معدل اليوم عندما: المخرجات مذكورة، جولات الملاحظات متفق عليها، والوقت ثابت نسبيًا.
- استخدم بالساعة عندما: المخرجات أو الاتجاه أو توقيت الموافقات قد يتغير في الأسبوع الأول.

1. ابدأ بقائمة المخرجات أولًا (المخرجات + أنواع الملفات + توقعات الصيغ).
2. أضف قاعدة المراجعة ثانيًا (مثل: “جولتان لكل مخرجات، ثم بالساعة للجولات الإضافية”).
3. بعدها اختر: معدل اليوم للثبات، وبالساعة لعدم اليقين.

| العامل | معدل اليوم يناسب | بالساعة يناسب |
| --- | --- | --- |
| قائمة المخرجات | محددة من البداية | ما تزال قيد التثبيت |
| عدد جولات المراجعة | محدود ومتفق عليه | غير واضح أو مرجح أن يتغير |
| سرعة الموافقة | متوقعة ضمن نوافذ محددة | قد تتأخر فتسبب وقتًا دون عمل |
| إضافات العميل | تتعامل معها كمزايا إضافية بسعر واضح | يمكن تتبع المهام المضافة |

## كيفية حساب معدل اليوم من أساس معدل الساعة (مع هامش للأسبوع الأول)

إذا كنت تعرف أساس معدل الساعة، فليس معدل اليوم “بالساعة × ساعات عشوائية”. تحتاج رقمًا واقعيًا لساعات العمل القابلة للفوترة في اليوم، وتحتاج احتساب التجهيز والتكرار. في أعمال العلامة، الوقت غير الإبداعي (مراجعة البرِيف، تجهيز الأصول، تنفيذ المراجعات) حقيقي.

ابدأ من ساعاتك القابلة للفوترة في يوم العمل (مثلاً 5 إلى 6 ساعات قابلة للفوترة، حسب أسلوب عملك وكيفية التعامل مع الاجتماعات). ثم أضف هامشًا للأسبوع الأول لكي لا تلتهم دورة الملاحظات الأولى هامشك.

- إذا أصرّ العميل على “7 أيام كاملة”، اسأله عن عدد أيام العمل الفعلية وكيف تُجدول نوافذ الملاحظات.

1. اختر ساعات الفوترة في اليوم بناءً على طريقة عملك (ومكان الاجتماعات).
2. شغّل أساس معدل الساعة في حاسبة المعدلات داخل Qufy للحصول على رقم يمكن الدفاع عنه.
3. اكتب بيان الأسبوع الأول: ما هو مشمول، ما الذي عليه سقف، وما الذي يفعّل فوترة إضافية.

| سؤال | إذا كانت نعم، يمكنك استخدام معدل اليوم |
| --- | --- |
| هل المخرجات مذكورة ومُرتّبة حسب الأولوية؟ | يمكنك وضع سقف للمراجعات وتحديد “الإتمام”. |
| هل لديك وتيرة ملاحظات مخططة؟ | يمكنك مواءمة معدل اليوم مع نوافذ العمل. |
| إذا تأخرت الملاحظات، هل يسمح العقد بإضافات بالساعة؟ | لن تخسر هامشك بسبب التأخيرات. |

## عملية مرتبة لعرض السعر يمكنك إعادة استخدامها (عرض → فاتورة → متابعة)

في وظيفة علامة لمدة أسبوعين، السرعة مهمة—لكن بعد أن تثبّت منطق التسعير. التسلسل التالي يجعل مخاطر الأسبوع الأول واضحة ويجعل الفوترة أكثر قابلية للتوقع.

- إذا طلب العميل “خصمًا” مقابل التزام بسعر ثابت للأيام، اطلب سقف مراجعات وقائمة استبعادات واضحة بدل تخفيض الأساس بدون حدود.

1. اجمع برِيف مختصر: المخرجات، صيغ التسليم المستهدفة، وعدد جولات المراجعة التي يمكنك الالتزام بها.
2. اختر نموذج التسعير: معدل يوم مع سقف مراجعات للعمل المستقر، أو بالساعة لاتجاه غير ثابت.
3. استخدم حاسبة المعدلات في Qufy لإخراج رقم واحد قابل للدفاع في عرضك.
4. اكتب قاعدة احتواء الأسبوع الأول (جملة واحدة) ومتى تبدأ فوترة إضافية.
5. أنشئ ملف PDF للفاتورة في Qufy وعرض تفاصيل الدفع مرتبطة ببنية الفاتورة التي اخترتها.
6. حدد تذكيرات وأرسلها للعميل عندما يقترب موعد الاستحقاق.

| عنصر في عرضك | نسخة معدل اليوم | نسخة بالساعة |
| --- | --- | --- |
| بيان النطاق | المخرجات + سقف مراجعات يحدد “الإتمام”. | المخرجات أهداف عمل؛ تتبع الوقت يعكس الجهد الحقيقي. |
| نوافذ ملاحظات العميل | متوافقة مع الأيام المشمولة في السعر. | متوافقة مع الساعات المنجزة حتى لو تغيّر وقت الملاحظات. |
| كيف تُسعّر الإضافات | الإضافات تُسعّر لكل مخرجات أو لكل مراجعة إضافية. | المهام الإضافية تُفوّت بالساعة مع قاعدة واضحة للسجل. |

## استخدم Qufy للحفاظ على اتساق معدلِك عبر أسبوعين

المشروع لمدة أسبوعين يعني أن عملك يتغير قليلًا من يوم لآخر. يساعدك Qufy على الحفاظ على منطق التسعير ثابتًا: تبدأ من معدل قابل للدفاع، ثم تحوله إلى عروض وفواتير مع تفاصيل دفع واضحة.

يمكنك أيضًا تسريع مرحلة عرض السعر عبر البدء من برِيف عبر WhatsApp، ثم تنقيح المخرجات وحدود المراجعة قبل إرسال العرض المكتوب للعميل.

- حاسبة المعدلات: ضع رقمًا واحدًا يمكن الدفاع عنه وتستطيع شرحه كتابة.
- عروض مع روابط مشاركة: أرسل العرض بسرعة ثم اتفق على المخرجات والمراجعات قبل بدء العمل.
- PDF للفواتير: تأكد من تفاصيل الدفع في بنية الفاتورة التي اخترتها.
- تتبع الوقت: تتبع على الويب أو عبر مؤقت ماك حتى يكون هامش الأسبوع الأول مبنيًا على جهد حقيقي.

1. إذا اخترت معدل يوم: عرّف سقف المراجعات والاستبعادات، ثم أرسل الفاتورة حسب جدول متفق عليه.
2. إذا اخترت بالساعة: تتبع الوقت في الأسبوع الأول وأكد النطاق، ثم افوتر مع تفاصيل الدفع المرتبطة بالساعات المتعقبة.

## قائمة تحقق لنطاق أسبوعين بلا خلاف (انسخها في عرضك)

قبل أن تختار معدل يوم أو بالساعة، اجعل “الإتمام” قابلًا للقياس. العناصر التالية تقلل الخلاف خلال الأسبوع الثاني وتحمي هامشك في الأسبوع الأول.

- المخرجات: اذكرها بوضوح (مثل أفكار شعار، ألوان هوية، قوالب سوشيال، صفحات دليل نمط).
- المراجعات: حدد عدد الجولات لكل مخرجات وما الذي يُحسب كمراجعة.
- نوافذ الملاحظات: اذكر متى تتوقع الملاحظات وكم تحتاج لتنفيذها.
- استبعادات: تغيير اتجاه جديد، أفكار إضافية، أو صيغ إضافية خارج القائمة المتفق عليها.
- جدول الدفع: مواعيد الاستحقاق وما الذي يفعّل الفاتورة التالية (تسليم منتصف المشروع، التسليم النهائي...).

| هدف البند | صياغة معدل اليوم | صياغة بالساعة |
| --- | --- | --- |
| تعريف نطاق الأسبوع الأول | “يشمل الأسبوع الأول استقبال العمل وإخراج المسودات الأولى وجولة مراجعة واحدة.” | “يشمل الأسبوع الأول جمع المتطلبات وصياغة العمل؛ يتم تتبع الوقت حتى تأكيد المخرجات.” |
| التعامل مع مراجعات إضافية | “الجولات الإضافية تُفوّت كمزايا إضافية.” | “التغييرات الإضافية تُفوّت بالساعة حسب الوقت المتعقب.” |
| إدارة المخرجات غير الواضحة | “ينطبق معدل اليوم بعد تثبيت المخرجات؛ قبل ذلك قد ينطبق بالساعة.” | “تتطور المخرجات؛ التسعير يعكس الوقت المنجز حتى محطات الاعتماد.” |

## أسئلة

### هل من الأفضل أن أقدّم معدل يوم أم بالساعة لوظيفة علامة لمدة أسبوعين؟

اختر معدل اليوم عندما تكون المخرجات ودورات المراجعة واضحة والإيقاع ثابت. اختر بالساعة عندما قد يتغير النطاق يوميًا أو لا يزال العميل يحدد معنى “الإتمام”.

### كيف أتجنب تقليل السعر في الأسبوع الأول؟

سعّر واقع الانطلاق: جمع المتطلبات، تجهيز الملفات، وجولة الملاحظات الأولى غالبًا تأخذ وقتًا أكثر من متوسط الساعة. أضف هامش أمان للأسبوع الأول، أو اختر تسعيرًا بالساعة إلى أن يصبح النطاق واضحًا.

### ماذا يجب أن أضمنه داخل عرض معدل اليوم لأعمال العلامة؟

ضمن عدد المخرجات، أقصى عدد جولات مراجعة لكل مخرجات، وتواتر التواصل (مثل نافذة ملاحظات واحدة يوميًا). حدّد أيضًا ما هو مستبعد (اتجاه جديد بالكامل، أفكار إضافية، أنواع ملفات إضافية).

### متى يكون التسعير بالساعة أفضل من معدل اليوم في أعمال العلامة؟

التسعير بالساعة أفضل عندما تتوقع عملًا استكشافيًا، أو موافقات تستغرق وقتًا، أو أولويات تتغير. يساعدك ذلك على بقاء العرض منصفًا إلى أن يثبت اتجاه المشروع ويستقر النطاق.

### هل يمكنني تقديم معدل يوم ثم التحويل إلى بالساعة لاحقًا؟

نعم، إذا صغته كشرط واضح. مثال: معدل يوم للأسبوع الأول لتجهيز العمل وإخراج المسودات الأولى، ثم بالساعة للإضافات أو مراجعات إضافية بعد تثبيت المخرجات المتفق عليها.

**احسب معدلًا يمكن الدفاع عنه في Qufy:** https://beta.qufy.app/rate

