# Milestone billing for a 3-month project: a safe split plan

> Use milestone billing to split a 3‑month project into clear invoices, reducing risk and clarifying deliverables so payment stays predictable.

- Canonical: https://beta.qufy.app/blog/milestone-billing-three-month-project
- Date: 2026-10-28
- Updated: 2026-10-28
- Category: invoice
- Tool: https://beta.qufy.app/invoice
- Keywords: milestone billing schedule, 3 month project invoice, split payments freelancer, deliverable based invoicing, invoice wording milestones, client payment terms

## Takeaways
- Use 3 milestones (start, mid-project, final) with deliverables named in the invoice—so payment ties to proof, not promises.
- Set payment due dates per milestone (e.g., 7 or 15 days) and send the invoice immediately after each milestone is approved or delivered.
- Include a short clause in each invoice: what happens if the client requests revisions after approval (scope and additional hours).

## Why milestone billing works for a 3‑month project

A three-month project is long enough for expectations to drift and short enough that delays feel personal. Milestone billing gives both sides a fair rhythm: the freelancer earns cash as real deliverables are delivered, and the client pays when they can see progress that matches the scope.

Done right, milestone invoices reduce the “all the risk” problem. Instead of one big invoice at the end (high client risk) or constant invoicing with unclear coverage (high freelancer risk), each payment becomes tied to a named milestone and a clear due date.

| Billing approach | Main risk to client |
| --- | --- |
| Pay 100% at end | Works completed but cash leaves late |
| Pay 100% upfront | Cash leaves early if scope changes |
| Milestones tied to deliverables | Payment follows proof; remaining risk is defined per milestone |

## Choose milestone payments that match real deliverables

Start by listing what “done” means in your niche. For most 3-month projects, you can group work into: (1) discovery/initial draft, (2) build/review rounds, (3) final delivery. Your milestone descriptions should be specific enough that a client can verify them without guessing.

If your project is technical (web/app/design system), think in files and outputs: pages, components, assets, documentation, and handoff notes. If your project is content or marketing, think in deliverables: outlines, drafts, final copy, and publishing checklist.

- Name each milestone with a deliverable list (what the client receives).
- Keep milestone size balanced: each one should be payable without needing the next one.
- Decide what counts as “approved” (email reply, shared folder link, or review window).

| Project type | Milestone 1 (Month ~1) | Milestone 2 (Month ~2) | Milestone 3 (Month ~3) |
| --- | --- | --- | --- |
| Website / landing pages | Design direction + wireframes | Build with components + first QA | Final pages + handoff package |
| Brand / design system | Style exploration + logo/visual options | System components + usage guidelines draft | Final kit + export files + sign-off |
| Copywriting / content | Outline + first draft segments | Revisions + tone alignment | Final copy + publishing checklist |

## A practical 3‑milestone payment split you can paste into invoices

For many freelancers, a defensible split is 30% / 40% / 30%. It protects the freelancer from doing months of work without meaningful payment, and it protects the client from paying everything before they see the mid-project output.

You can adjust based on project uncertainty: if scope is very clear, you might lean toward lower upfront. If the work has more exploration, keep a stronger first milestone for your planning and setup time.

- Milestone 1 (30%): start + discovery + initial deliverables.
- Milestone 2 (40%): build/implementation + review round deliverables.
- Milestone 3 (30%): final delivery + handoff package + sign-off.

| Split type | Milestone 1 | Milestone 2 | Milestone 3 |
| --- | --- | --- | --- |
| Balanced (common) | 30% | 40% | 30% |
| Client-protective (less upfront) | 20% | 50% | 30% |
| Freelancer-protective (more upfront planning) | 40% | 30% | 30% |

## Invoice layout for milestones: the minimum that must be clear

A milestone invoice should read like a checklist. The client should be able to answer: “Did you deliver the milestone we paid for?” without opening the entire contract every time. In Qufy invoices, focus on the line items, the payment details, and a short note describing what the milestone covers.

Also, do not mix milestone billing with vague “progress” fees. If you need to invoice for ongoing work, define it as a deliverable (e.g., “implementation round + updated files”) so the payment still ties to evidence.

- Line item description: milestone name + deliverables count + delivery date.
- Notes section: approval method + revision boundary (scope included vs extra).
- Payment due date: chosen per milestone invoice.

1. Draft the milestone invoice line items: “Milestone 1 deliverables delivered on DATE.”
2. Add one short clause in the invoice notes: revisions after approval follow agreed scope or additional hours.
3. Send the invoice immediately after milestone delivery/approval and confirm due date in the same email message.

| What you want to say | Client-friendly wording |
| --- | --- |
| What the invoice payment covers | Payment covers Milestone 2: implementation + updated deliverables (files listed above). |
| How approval is confirmed | Milestone is considered approved when the client replies with “approved” or confirms the shared link review window. |
| How revisions work | Any revisions requested after approval are handled within the agreed scope; out-of-scope work is billed separately by agreed rate. |
| Due date behavior | Invoice is due on the stated due date. If payment is delayed, work continues only within agreed availability and scope. |

## Milestone billing vs hourly billing: when each approach protects you

Milestone billing and hourly billing both can be fair, but they solve different problems. Milestones solve clarity and risk distribution. Hourly billing solves “scope uncertainty” when deliverables can change minute to minute.

For a typical 3-month project with defined outputs, milestone invoices are usually easier to defend and easier for clients to approve—because they know what they are buying at each payment.

- Use milestones when deliverables can be listed and verified.
- Use hourly when scope will evolve day-by-day and you need flexibility.
- Hybrid option: milestones for base scope + hourly for agreed add-ons.

| Situation | Milestone billing tends to work best | Hourly billing tends to work best |
| --- | --- | --- |
| Client wants predictable payment | You can define milestones with due dates | You can’t list deliverables yet |
| Scope is mostly stable | Deliverables can be checked in each stage | You expect frequent changes |
| You want fewer invoice discussions | Payment ties to named proof | Disputes can be handled via tracked time |

## Make due dates and reminders part of the plan

Milestones are only safe if the timing is explicit. Choose a due date per invoice and tell the client what happens if they miss it—without sounding threatening. A simple, professional reminder policy reduces back-and-forth.

Qufy can help you send client reminder emails and keep invoice details in front of you. Pair that with a consistent schedule like: send invoice immediately after milestone delivery, remind once after a short delay, then follow your usual process.

- Suggested due dates: 7 or 15 days for milestone invoices (pick one standard).
- Send invoice right after the deliverable is uploaded/shared and the client is notified.
- Use reminders sparingly but consistently to keep the schedule moving.

1. Set the due date for Milestone 1 in your Qufy invoice.
2. Send the invoice right after delivering the milestone package.
3. Use reminder emails if payment is not marked as received by the reminder window.
4. Repeat the same pattern for Milestone 2 and 3 to keep expectations consistent.

| Due date chosen | Reminder #1 (after due date) | Reminder #2 (optional) |
| --- | --- | --- |
| 7 days | 1-2 days | 3-4 days |
| 15 days | 2-3 days | 6-7 days |
| Custom (client policy) | Match their internal process window | Only if still needed |

## A short contract + invoice checklist for milestone billing

Invoices are not a substitute for agreement. If you tie payments to milestones, the contract should confirm: what’s included, what’s excluded, and how approvals work. This is what keeps disputes small if the client changes priorities mid-project.

Use this checklist before you send the first invoice. When both sides can point to the same milestone definitions, you reduce misunderstanding and you speed up approvals.

- Milestone definitions: deliverables, delivery method, and acceptance trigger.
- Payment schedule: amounts, invoice dates, due dates, and what each payment covers.
- Revision boundary: how many rounds are included and what becomes billable afterward.
- Out-of-scope process: how add-ons are requested and priced.

1. List 3 milestones with deliverables and dates (Month 1, Month 2, Month 3).
2. Draft the payment schedule (example 30/40/30) and align each amount to a milestone.
3. Add an acceptance rule (email reply, link review window, or written sign-off).
4. Send the contract for signature via a link, then issue Milestone 1 invoice after delivery/acceptance.
5. Repeat the invoice template for Milestones 2 and 3 with only the deliverable details changed.

| Topic | Best place in contract | Best place in invoice |
| --- | --- | --- |
| Milestone scope | Included vs excluded work boundaries | One-line deliverable list + delivery date |
| Acceptance method | How approvals are granted in writing | Invoice note referencing the acceptance trigger |
| Payment schedule | Amounts and due dates agreed upfront | The due date for this specific invoice |
| Revision rules | What is included and what is billed later | Short reminder: revisions after approval follow scope/billed hours |

## Send a milestone-ready invoice in Qufy (what to fill)

When you create invoices in Qufy, use them to communicate clarity, not just amounts. Include payment details for the chosen invoice, add a clear milestone description in the line items, and keep your due date consistent with your agreed schedule.

If your project also uses tracked time, use it to support scope boundaries (especially for out-of-scope requests). Qufy supports time tracking on the web and the Mac timer, which helps you answer “what work was done” when questions come up.

- Add line items for each milestone payment (Milestone 1/2/3).
- Check payment details shown on the invoice before sending.
- Use consistent wording in notes so the client sees the same acceptance and revision rules each time.

| Field to verify | What “good” looks like |
| --- | --- |
| Milestone line item | Milestone name + deliverables + delivery date |
| Invoice due date | Matches the agreed schedule for this milestone |
| Invoice notes | Acceptance trigger + revision boundary reminder |
| Payment details | Correct for the chosen invoice and payment method |

## FAQ

### How do I invoice a 3‑month project using milestone billing?

Pick 3 milestones that match real deliverables, then invoice each milestone after delivery or approval. Keep the payment due date tied to the invoice date, and write a one-line description of what the payment covers.

### What percentage split reduces risk for both freelancer and client?

A common low-risk structure is 30% start, 40% mid-project, 30% final. It gives you cash flow while still giving the client meaningful work delivered before the final payment.

### When should I send the milestone invoice during the project timeline?

Send each invoice immediately after the milestone is delivered and (if required) approved. If approval takes time, invoice on delivery and reference the approval window in the invoice notes.

### What wording should I use so milestones are clear and disputes are less likely?

Use deliverable-based language: “Milestone 2: design handoff (X screens/files) delivered on DATE.” Avoid vague phrases like “progress update.” Add a note that additional revisions follow the agreed scope or billed hours.

### Do I need a separate contract clause for milestone billing?

Yes. Add a clear payment schedule linked to milestones, plus a scope boundary for what is included in each payment. This keeps invoice disputes smaller because both sides agreed on scope upfront.

**Build milestone invoices with Qufy:** https://beta.qufy.app/invoice


---

# تقسيم الدفعات على مراحل لمشروع 3 أشهر بخطة آمنة

> طبّق تقسيم الدفعات على مراحل لمشروع 3 أشهر عبر فواتير واضحة تقلل المخاطر وتحدد التسليمات ليصبح تحصيل المبالغ أكثر توقعًا.

- Canonical: https://beta.qufy.app/blog/milestone-billing-three-month-project
- Date: 2026-10-28
- Updated: 2026-10-28
- Category: invoice
- Tool: https://beta.qufy.app/invoice
- Keywords: تقسيم الدفعات على مراحل, جدول فواتير مشروع 3 أشهر, فواتير حسب التسليم, نص الفاتورة للمراحل, شروط الدفع للعميل, مخاطر تأجيل الدفع

## الخلاصات
- استخدم 3 مراحل (بدء، منتصف، تسليم نهائي) مع تسليمات محددة في الفاتورة، ليكون الدفع مرتبطًا بدليل وليس بوعود.
- حدد تواريخ الاستحقاق لكل مرحلة (مثل 7 أو 15 يومًا) وأرسل الفاتورة فور تسليم المرحلة أو اعتمادها.
- أضف بندًا قصيرًا في كل فاتورة: ما الذي يحدث عند طلب تعديلات بعد الاعتماد (نطاق العمل وساعات إضافية).

## لماذا تعمل الفوترة على مراحل لمشروع 3 أشهر

مشروع مدته 3 أشهر كافٍ ليبدأ فهم الطرفين يتغير مع الوقت، وفي نفس الوقت قصير ليصبح أي تأخير مؤثرًا. الفوترة على مراحل تعطي إيقاعًا عادلًا: يحصل مقدم الخدمة على مقابل تدريجي عند تقديم تسليمات حقيقية، بينما يدفع العميل عند رؤية تقدم مرتبط بالنطاق.

عند تطبيقها بشكل صحيح، تقلل الفوترة على مراحل مشكلة “حمل كل المخاطر”. بدل فاتورة كبيرة واحدة في النهاية (مخاطرة عالية على العميل) أو فواتير متكررة دون تغطية واضحة (مخاطرة عالية على مقدم الخدمة)، يصبح كل دفع مرتبطًا بمرحلة محددة وبموعد استحقاق واضح.

| أسلوب الفوترة | الخطر الأساسي على العميل |
| --- | --- |
| دفع 100% في النهاية | تسليم العمل لكن الخروج المالي يتأخر |
| دفع 100% مقدّمًا | الخروج المالي مبكر إذا تغير النطاق |
| مراحل مرتبطة بتسليمات | الدفع يتبع دليلًا، والمخاطر المتبقية محددة لكل مرحلة |

## اختر دفعات المراحل بما يتوافق مع تسليمات حقيقية

ابدأ بتحديد معنى “الإنجاز” في مجالك. في أغلب مشاريع 3 أشهر، يمكنك تجميع العمل إلى: (1) استكشاف/مسودة أولية، (2) تنفيذ/جولات مراجعة، (3) تسليم نهائي. يجب أن تكون عبارات المراحل محددة بحيث يستطيع العميل التحقق منها دون تخمين.

إذا كان مشروعك تقنيًا (موقع/تطبيق/نظام تصميم)، فكر في ملفات ومخرجات: صفحات، مكونات، أصول، توثيق، وملاحظات التسليم. وإذا كان المحتوى أو التسويق، فكر في التسليمات: مخططات، مسودات، نص نهائي، وقائمة نشر.

- سمِّ كل مرحلة بقائمة تسليمات (ماذا يستلم العميل).
- وازن بين حجم كل مرحلة: يجب أن تكون قابلة للدفع دون انتظار المرحلة التالية.
- حدد ما الذي يعتبر “اعتمادًا” (رد عبر البريد، رابط مجلد، أو نافذة مراجعة).

| نوع المشروع | المرحلة 1 (حوالي الشهر 1) | المرحلة 2 (حوالي الشهر 2) | المرحلة 3 (حوالي الشهر 3) |
| --- | --- | --- | --- |
| موقع/صفحات هبوط | اتجاه تصميم + مخططات | تنفيذ بمكونات + أول فحص | صفحات نهائية + حزمة تسليم |
| هوية/نظام تصميم | استكشاف أسلوب + خيارات شعارات/مرئيات | مكونات النظام + مسودة إرشادات | حزمة نهائية + ملفات تصدير + اعتماد |
| كتابة محتوى | مخطط + أجزاء مسودة | مراجعات + ضبط النبرة | نص نهائي + قائمة نشر |

## تقسيم عملي لدفعات 3 مراحل يمكنك لصقه في الفواتير

بالنسبة لكثير من مقدمي الخدمة، تقسيم يمكن الدفاع عنه هو 30% / 40% / 30%. يحمي مقدم الخدمة من تنفيذ أشهر دون مقابل كافٍ، ويحمي العميل من دفع كل شيء قبل رؤية مخرجات منتصف المشروع.

يمكنك تعديل التقسيم حسب وضوح النطاق: إذا كان النطاق واضحًا جدًا، قد تميل إلى دفعة مقدمة أقل. وإذا كان العمل يحتاج استكشافًا، حافظ على مرحلة أولى أقوى لتغطية وقت التخطيط والإعداد.

- المرحلة 1 (30%): بدء + استكشاف + تسليمات أولية.
- المرحلة 2 (40%): تنفيذ/بناء + تسليمات جولة مراجعة.
- المرحلة 3 (30%): تسليم نهائي + حزمة تسليم + اعتماد.

| نوع التقسيم | المرحلة 1 | المرحلة 2 | المرحلة 3 |
| --- | --- | --- | --- |
| متوازن (شائع) | 30% | 40% | 30% |
| يحمي العميل (دفعة مقدمة أقل) | 20% | 50% | 30% |
| يحمي مقدم الخدمة (دفعة مقدمة أعلى) | 40% | 30% | 30% |

## شكل الفاتورة للمراحل: الحد الأدنى الذي يجب أن يكون واضحًا

يجب أن تبدو فاتورة المرحلة كقائمة تحقق. يستطيع العميل أن يجيب: “هل سلّمت المرحلة التي دفعنا مقابلها؟” دون الرجوع إلى العقد كل مرة. في فواتير Qufy، ركز على البنود، تفاصيل الدفع، وملاحظة قصيرة توضّح ماذا تغطي المرحلة.

وتجنب خلط فوترة المراحل برسوم تقدّم غير محددة. إذا احتجت فوترة لعمل مستمر، عرّفه بتسليم (مثل “جولة تنفيذ + ملفات محدثة”) كي يبقى الدفع مرتبطًا بدليل.

- وصف البنود: اسم المرحلة + عدد التسليمات + تاريخ التسليم.
- قسم الملاحظات: طريقة الاعتماد + حدود التعديلات (المشمول مقابل الإضافي).
- تاريخ الاستحقاق: تحدده لكل فاتورة مرحلة.

1. اكتب بنود فاتورة المرحلة: “تسليم المرحلة 1 بتاريخ DATE”.
2. أضف بندًا قصيرًا في الملاحظات: التعديلات بعد الاعتماد ضمن النطاق المتفق عليه أو وفق ساعات إضافية.
3. أرسل الفاتورة فور تسليم/اعتماد المرحلة وأكد تاريخ الاستحقاق في رسالة الإرسال نفسها.

| ماذا تريد أن تقول | صياغة سهلة للعميل |
| --- | --- |
| ماذا يغطي الدفع | الدفع يغطي المرحلة 2: تنفيذ + تسليمات محدثة (الملفات مذكورة أعلاه). |
| كيف يتم تأكيد الاعتماد | تعتبر المرحلة معتمدة عند رد العميل بكلمة “تمت الموافقة” أو تأكيد نافذة مراجعة الرابط المشترك. |
| كيف تعمل التعديلات | أي تعديلات بعد الاعتماد تتم ضمن النطاق المتفق عليه، والعمل خارج النطاق يتم فوترته بشكل منفصل وفق السعر المتفق عليه. |
| سلوك الاستحقاق | تستحق الفاتورة في تاريخ الاستحقاق المذكور. إذا تأخر الدفع، يستمر العمل فقط ضمن التوفر والنطاق المتفق عليه. |

## فوترة المراحل مقابل الفوترة بالساعة: متى تحمي كل طريقة؟

كل من فوترة المراحل والفوترة بالساعة يمكن أن تكون عادلة، لكن كل واحدة تحل مشكلة مختلفة. المراحل تحل وضوح النطاق وتوزيع المخاطر. الفوترة بالساعة تحل عدم وضوح النطاق عندما قد يتغير العمل بشكل متكرر.

في مشروع مدته 3 أشهر مع مخرجات محددة، غالبًا تكون فواتير المراحل أسهل للدفاع عنها وأسهل للموافقة من العميل؛ لأن العميل يعرف ما الذي يدفع مقابله في كل دفعة.

- استخدم المراحل عندما يمكن سرد التسليمات والتحقق منها.
- استخدم بالساعة عندما سيتغير النطاق يومًا بعد يوم وتحتاج مرونة.
- خيار هجين: مراحل للنطاق الأساسي + ساعات للطلبات الإضافية المتفق عليها.

| الحالة | فوترة المراحل غالبًا أنسب | فوترة بالساعة غالبًا أنسب |
| --- | --- | --- |
| العميل يريد دفعًا متوقعًا | يمكنك تحديد مراحل مع تواريخ استحقاق | لا يمكنك سرد التسليمات بعد |
| النطاق شبه ثابت | يمكن التحقق من التسليمات في كل مرحلة | تتوقع تغييرات متكررة |
| تريد تقليل نقاشات الفواتير | يرتبط الدفع بدليل محدد | يمكن التعامل مع الخلافات عبر توثيق الوقت |

## اجعل تواريخ الاستحقاق والتذكير جزءًا من الخطة

المراحل لا تصبح آمنة إلا إذا كان توقيت الدفع واضحًا. اختر تاريخ استحقاق لكل فاتورة وأخبر العميل ماذا يحدث إذا تأخر دون نبرة تهديد. سياسة تذكير بسيطة تقلل المراسلات.

يساعدك Qufy على إرسال تذكيرات للعميل عبر البريد وتبقي تفاصيل الفاتورة أمامك. اجمع ذلك مع جدول ثابت مثل: إرسال الفاتورة فور تسليم المرحلة، ثم تذكير مرة واحدة بعد تأخير بسيط، ثم اتباع مسارك المعتاد.

- تواريخ استحقاق مقترحة: 7 أو 15 يومًا لفواتير المراحل (اختر معيارًا واحدًا).
- أرسل الفاتورة فور رفع/مشاركة التسليم وإشعار العميل.
- استخدم التذكير بقدر كافٍ وبانتظام للحفاظ على سير الجدول.

1. حدد تاريخ الاستحقاق للمرحلة 1 داخل فاتورة Qufy.
2. أرسل الفاتورة فور تقديم حزمة المرحلة.
3. استخدم رسائل التذكير إذا لم يتم تسجيل الاستلام ضمن نافذة التذكير.
4. كرر نفس النمط للمرحلة 2 و3 ليبقى مستوى التوقعات ثابتًا.

| تاريخ الاستحقاق المحدد | التذكير #1 (بعد الاستحقاق) | التذكير #2 (اختياري) |
| --- | --- | --- |
| 7 أيام | 1-2 يوم | 3-4 أيام |
| 15 يومًا | 2-3 أيام | 6-7 أيام |
| مخصص (سياسة العميل) | طابق نافذة العملية الداخلية لديهم | فقط إذا كان ما زال مطلوبًا |

## قائمة قصيرة للعقد والفواتير لفوترة المراحل

الفواتير لا تغني عن الاتفاق. إذا ربطت الدفعات بمراحل، يجب أن يؤكد العقد: ما الذي يشمله العمل، ما الذي لا يشمله، وكيف تتم الموافقات. هذا ما يجعل الخلافات أصغر إذا غيّر العميل أولوياته أثناء المشروع.

استخدم هذه القائمة قبل إرسال أول فاتورة. عندما يستطيع الطرفان الرجوع إلى نفس تعريفات المراحل، تقل سوء الفهم وتسرع الموافقات.

- تعريفات المراحل: التسليمات وطريقة التسليم ومؤشر القبول.
- جدول الدفع: المبالغ وتواريخ الفواتير وتواريخ الاستحقاق وماذا يغطي كل دفع.
- حدود التعديلات: عدد الجولات المشمولة وما الذي يصبح مدفوعًا بعد ذلك.
- إجراء خارج النطاق: كيف تُطلب الإضافات وكيف تُسعّر.

1. اكتب 3 مراحل مع تسليمات وتواريخ (الشهر 1، الشهر 2، الشهر 3).
2. جهز جدول الدفع (مثال 30/40/30) واطابق كل مبلغ مع مرحلة.
3. أضف قاعدة اعتماد (رد عبر البريد، نافذة مراجعة الرابط، أو توقيع مكتوب).
4. أرسل العقد للتوقيع عبر رابط ثم أصدر فاتورة المرحلة 1 بعد التسليم/الاعتماد.
5. كرر قالب الفاتورة للمرحلة 2 و3 مع تغيير تفاصيل التسليم فقط.

| الموضوع | أفضل مكان في العقد | أفضل مكان في الفاتورة |
| --- | --- | --- |
| نطاق المرحلة | حدود المشمول مقابل المستثنى | قائمة تسليمات سطر واحد + تاريخ التسليم |
| طريقة الاعتماد | كيف تتم الموافقات كتابة | ملاحظة الفاتورة التي تشير إلى مؤشر الاعتماد |
| جدول الدفع | المبالغ وتواريخ الاستحقاق المتفق عليها | تاريخ استحقاق هذه الفاتورة تحديدًا |
| قواعد التعديلات | ما الذي هو مشمول وما الذي يُفوتر لاحقًا | تذكير مختصر: التعديلات بعد الاعتماد ضمن النطاق/ساعات مفوترة |

## أرسل فاتورة جاهزة للمراحل في Qufy (ماذا تملأ)

عند إنشاء الفواتير في Qufy، استخدمها لنقل الوضوح وليس فقط المبالغ. أدرج تفاصيل الدفع لهذه الفاتورة، واكتب وصف المرحلة بوضوح في البنود، وحافظ على تاريخ الاستحقاق متوافقًا مع الجدول المتفق عليه.

إذا كان مشروعك يعتمد أيضًا على توثيق الوقت، استخدمه لدعم حدود النطاق (خصوصًا لطلبات خارج النطاق). Qufy يدعم تتبع الوقت على الويب وعلى مؤقت Mac، مما يساعدك على الإجابة “ما الذي تم إنجازه” عند ظهور أسئلة.

- أضف بنودًا لكل دفعة مرحلة (المرحلة 1/2/3).
- راجع تفاصيل الدفع الظاهرة في الفاتورة قبل الإرسال.
- استخدم صياغة متناسقة في الملاحظات حتى يرى العميل نفس قواعد الاعتماد والتعديلات في كل مرة.

| الحقل للتأكد منه | كيف يكون “جيدًا” |
| --- | --- |
| بند المرحلة | اسم المرحلة + التسليمات + تاريخ التسليم |
| تاريخ استحقاق الفاتورة | يتوافق مع جدول الدفع المتفق عليه لهذه المرحلة |
| ملاحظات الفاتورة | مؤشر الاعتماد + تذكير بحدود التعديلات |
| تفاصيل الدفع | صحيحة لهذه الفاتورة وطريقة الدفع |

## أسئلة

### كيف أفوتر مشروعًا لمدة 3 أشهر بنظام الفواتير على مراحل؟

اختر 3 مراحل تتوافق مع تسليمات حقيقية ثم فوّتر كل مرحلة بعد التسليم أو الاعتماد. اربط تاريخ الاستحقاق بتاريخ الفاتورة، واكتب وصفًا سطرًا واحدًا يوضح ماذا يغطي المبلغ.

### ما تقسيم النسب الذي يقلل المخاطر للطرفين؟

هيكل شائع منخفض المخاطر: 30% عند البدء، 40% في منتصف المشروع، و30% عند التسليم النهائي. يمنحك سيولة بينما يحصل العميل على جزء كبير من العمل قبل دفع الدفعة الأخيرة.

### متى أرسل فاتورة المرحلة أثناء مدة المشروع؟

أرسل كل فاتورة فور تسليم المرحلة وإذا لزم الأمر بعد اعتمادها. إذا كان الاعتماد يستغرق وقتًا، فوّتر عند التسليم واذكر نافذة الاعتماد في ملاحظات الفاتورة.

### ما الصياغة التي تجعل المراحل واضحة وتقلل الخلافات؟

استخدم لغة مبنية على تسليمات: “المرحلة 2: تسليم التصميم (X صفحات/ملفات) بتاريخ DATE”. تجنب عبارات عامة مثل “تحديث تقدم”. أضف ملاحظة بأن أي تعديلات إضافية ضمن النطاق المتفق عليه أو وفق ساعات مدفوعة.

### هل أحتاج بندًا منفصلًا في العقد لفوترة المراحل؟

نعم. أضف جدول دفع واضح مرتبطًا بالمراحل وحدد حدود النطاق لكل دفعة. هذا يقلل حجم الخلافات حول الفاتورة لأن الطرفين اتفقا على النطاق مسبقًا.

**أنشئ فواتير المراحل باستخدام Qufy:** https://beta.qufy.app/invoice