# Revision Rounds for Fixed-Price Projects: Count, Price

> Define revision rounds in your scope, set what counts as a revision, price extras, and write a simple clause clients approve before work starts.

- Canonical: https://beta.qufy.app/blog/revision-rounds-fixed-price-job
- Date: 2026-11-09
- Updated: 2026-11-09
- Category: contract
- Tool: https://beta.qufy.app/contract
- Keywords: fixed-price contract revisions, revision rounds clause, pricing extra revisions, scope of work definitions, client approval before work starts, what counts as a revision

## Takeaways
- Write a revision-definition sentence: what is included, what is not, and when a round starts.
- Price extra rounds as a separate line item (X per extra round), not “time and materials” surprises.
- State a counting rule: one client feedback cycle per submission, and one “approved” milestone closes the round.

## Why revision rounds belong in the contract (not just in chat)

Fixed-price work fails most often when “revisions” becomes a fuzzy word. One side thinks revisions are minor tweaks; the other thinks revisions include rethinking the whole direction. When the contract is silent, every new feedback message turns into a negotiation.

A good contract doesn’t just limit work—it sets a shared counting method. You define what is included, how many rounds are included, what happens when the client asks for more, and how it impacts price and timelines.

| Contract item | Your goal |
| --- | --- |
| Revision definition | Make “revision” mean one specific type of change. |
| Included rounds | Set a number you can actually deliver under the fixed price. |
| Extra round pricing | Avoid surprises when feedback continues. |

## Step 1: Choose a counting rule (submission → feedback → revised)

Your counting rule should be simple enough that both you and the client can apply it in real time. Most freelancers prefer a “submission cycle” model: a draft submission triggers one feedback window. When you deliver the revised version, you close that cycle.

Avoid counting per message or per comment. Clients send feedback in batches, then follow up. If you count messages, you create accidental extra rounds that look like a fee dispute.

- Use one round per feedback cycle after each submission.
- Define the moment the round starts (when your draft is delivered).
- Define the moment the round ends (when you deliver the revised draft).

1. Pick the unit: “one revision round = one feedback cycle per submission.”
2. List included rounds in the scope (e.g., 2 rounds for draft A).
3. Write a sentence that new feedback after the revised submission starts a new round (and may be billable).

| Method | How it counts | Best for | Risk to avoid |
| --- | --- | --- | --- |
| Submission cycle | 1 round per draft submission + client feedback. | Most fixed-price design and writing tasks. | Counting per message creates extra rounds by accident. |
| Per deliverable | Rounds reset for each separate output. | Projects with multiple independent deliverables. | Clients may expect cross-deliverable unlimited changes. |
| Per milestone | Rounds tie to approval steps (Draft → Revise → Final). | Complex builds with approval checkpoints. | If milestones are vague, approvals become subjective. |

## Step 2: Decide what counts as a “revision” (and what does not)

Clients often ask for new direction while thinking it is still a revision. Protect your fixed price by separating three buckets: revision, clarification within scope, and out-of-scope change.

In practice, define revision as changes that remain within the same objectives, the same deliverable, and the same agreed content. Define out-of-scope as changes that add new deliverables, change the deliverable type, change requirements after approval, or require major rework due to new branding, new technical constraints, or new audience assumptions.

- Included revision: typography tweaks, rewording copy within the same structure, layout adjustments within the same pages.
- Clarification: you answer questions that were missing, and you document it as a scope note.
- Out-of-scope: new feature, new page count, different content requirements, or a new deliverable type.

1. Write one sentence that defines “Revision” and one sentence that defines “Out-of-scope change.”
2. Keep the definitions short and testable: the client should be able to apply them to their own request.

| Request type | Counts as | How it is billed | Timeline impact |
| --- | --- | --- | --- |
| Minor layout changes | Revision | Within included rounds (or billed if extra rounds). | Applies to the revision turnaround time. |
| Fixing a missing asset or missing text | Clarification within scope | Included if the client provided everything needed; otherwise treated as a delivery dependency. | Depends on when the asset/text arrives. |
| New page, new template, new feature | Out-of-scope change | Quoted separately and added to the price. | May shift the delivery date by scope and review volume. |

## Step 3: Price the extra revision rounds without weakening your fixed price

You want the client to feel the limit is fair, while you keep control of your effort. The cleanest approach is to: (1) include a defined number of revision rounds in the fixed price, then (2) price any additional rounds with a per-round amount.

State the per-round pricing clearly, and attach it to the counting rule you chose earlier. Also state that out-of-scope changes are not “extra rounds”—they are separate quotes.

- Include: “2 revision rounds are included in the fixed price.”
- Price extras: “Extra revision rounds are billed at X per round.”
- Tie to cycle: “A new round starts after you deliver the revised version.”

1. Set X based on your typical time per revision cycle, including your review, corrections, and QA.
2. Write the clause so the client can forecast cost after approval, not during disputes.

| Option | Pricing rule | Clarity level | Where it fits |
| --- | --- | --- | --- |
| Per extra round | X per additional revision round. | High (easy to forecast). | Design, copy edits, layout iterations. |
| Per hour after included rounds | Time billed at your rate once included rounds are used. | Medium (more variables). | When revisions vary a lot in complexity. |
| Fixed fee cap for extras | Extra rounds are billed up to a maximum cap, then quote again. | High (protects both sides). | When the client is uncertain but wants cost control. |

## Step 4: Write a “revision clause” you can paste into your contract

Below is a ready-to-paste clause structure. Use it as a template: keep the parts you can defend (counting rule, included rounds, extra pricing, out-of-scope separation).

If you use Qufy, you can keep your contract terms consistent across projects by filling the same revision fields every time. That reduces mistakes and makes client questions shorter.

- Definition: one sentence for “Revision” and one for “Out-of-scope change.”
- Counting: define the cycle from submission to revised delivery.
- Limits: included rounds + what happens next (extra rounds priced).
- Timeline: state that extra rounds can affect delivery dates.

1. Quote → contract review → signed link: confirm your scope and revision terms before any work starts.

| Clause part | What to write | Example text |
| --- | --- | --- |
| Included rounds | State the number included in the fixed price. | “2 revision rounds are included for Draft 1 and Draft 2.” |
| Counting rule | Tie one round to one feedback cycle per submission. | “One revision round equals one feedback cycle after each submission.” |
| Extra pricing | Set X per extra round and mention billed after included rounds. | “Extra rounds are billed at X per round.” |
| Out-of-scope | Separate major scope changes from revision rounds. | “Out-of-scope changes require a new quote and may change delivery dates.” |

## How to communicate revision limits before you start (without sounding harsh)

The best time to discuss revision rounds is at the approval stage. Use language that reduces fear: you are not saying “no,” you are saying “within a defined process.”

A practical approach is: send the revision summary with the quote, then ask for a yes/no confirmation. When you also attach payment details and due dates in your invoice later, the client sees the project is run like a system.

- Start with the included part: “You get 2 revision rounds included.”
- Then show the next step: “Extra rounds are billed per round after submissions.”
- Finally, clarify out-of-scope: “New deliverables need a new quote.”

1. Send a WhatsApp-friendly summary to confirm the revision process, then keep the contract as the source of truth.
2. After the client approves, track time with web or Mac timer only for cases that truly fall into extras or out-of-scope.

| When to send | Short message |
| --- | --- |
| With the quote | “Included: 2 revision rounds. Each round = one feedback cycle after each draft submission. Extra rounds: X per round. New deliverables: new quote.” |
| Right before you start | “Please confirm the revision process. Once you approve Draft 1, we’ll proceed and count revisions by the cycle rule.” |
| When extra feedback arrives | “Thanks. This would be an extra revision round beyond the included rounds. I can proceed once you confirm and approve the added cost.” |

## Practical workflow: quote → contract → deliver drafts → count rounds

You can reduce disputes by running the project like a sequence of approvals. Set what the client receives at each draft, how feedback should be bundled, and how you’ll record the round count.

When you use Qufy contract features, keep the contract signed via link and rely on the revision clause as the reference. When you issue invoices, show the payment details and due dates based on what the contract authorizes (fixed amount plus any approved extras).

- Bundle feedback: ask the client to send one consolidated feedback list per round.
- Track what version they approved: Draft 1, Draft 2, Final.
- If you move to extras, confirm in writing and then proceed.

1. Quote: include the included revision rounds and extra pricing in your quote summary.
2. Contract: sign the scope first using the contract link (with the revision clause).
3. Draft 1: deliver and ask for feedback as one consolidated list.
4. Count: each feedback cycle on Draft 1 consumes one included round (or starts an extra round).
5. Invoice: issue fixed-price payment for the contract amount, then add approved extra rounds if any.

| Deliverable | Included rounds | Extra round price |
| --- | --- | --- |
| Logo concepts (Draft 1–2) | 2 rounds | X per extra round |
| Brand usage guide (1 page) | 1 round | X per extra round |
| Website homepage layout | 2 rounds | X per extra round |

## Common mistakes when you don’t specify revision rounds

If your contract only says “X revisions,” but doesn’t define a revision or counting method, clients will interpret the word differently. You may end up working extra cycles while the client believes everything is still included.

Also avoid unlimited “revisions” in a fixed-price project. You can be flexible in scope, but fixed-price means you need boundaries. Better to offer a clear path: included rounds now, then extra rounds priced transparently.

- Mistake: counting per message instead of per submission cycle.
- Mistake: treating out-of-scope changes as included revisions.
- Mistake: not stating timeline impact when extras add more cycles.
- Mistake: delaying the discussion until after multiple rounds are already done.

| Problem in wording | Better contract fix |
| --- | --- |
| “Revisions included” (no count method). | Define one revision round = one feedback cycle per submission. |
| “Unlimited revisions” with a fixed price. | Replace with included rounds + priced extra rounds + out-of-scope separate quotes. |
| No statement about delivery date changes. | Add: extra rounds may shift delivery dates; dependencies also apply. |

## FAQ

### How do I count revision rounds in a fixed-price job?

Pick a counting unit tied to submissions: each time you deliver a draft and the client sends feedback, that cycle is one revision round. After you send the revised version, the next round starts when new feedback is provided for the new draft.

### What counts as a revision versus a new request?

Revision usually means changes to the same agreed scope and the same direction already approved. A new request is work that changes objectives, adds deliverables, expands platforms, or requires major rework due to new requirements after approval.

### How should I price extra revision rounds?

Use a clear per-round rate (for example, “X per extra revision round”) and state it applies after the included rounds are consumed. Mention that extra rounds apply to revisions only, while out-of-scope changes are handled separately.

### Should I list revision rounds per deliverable or for the whole project?

If deliverables are independent (e.g., logo variations vs. website sections), listing per deliverable reduces disputes. If everything is a single cohesive output, counting per project is simpler—just define submissions clearly.

### How do I phrase revision limits so clients accept them?

Frame it as fairness and predictability: you include a reasonable number of rounds, then extra rounds are priced. Add a note that you can do unlimited revisions within the agreed scope only if the client stays within the definition and approvals.

**Use a contract checklist and clause you can paste:** https://beta.qufy.app/contract


---

# جولات المراجعة في مشروع بسعر ثابت: العدّ والتسعير والتواصل

> حدّد جولات المراجعة ضمن نطاق العمل، واتفق على ما الذي يُحسب مراجعة، وحدد سعر الزيادات، ثم اكتب بندًا واضحًا يوافق عليه العميل قبل البدء.

- Canonical: https://beta.qufy.app/blog/revision-rounds-fixed-price-job
- Date: 2026-11-09
- Updated: 2026-11-09
- Category: contract
- Tool: https://beta.qufy.app/contract
- Keywords: عقد بسعر ثابت مراجعات, بند جولات المراجعة, تسعير المراجعات الإضافية, تعريف نطاق العمل, موافقة العميل قبل البدء, ما الذي يُحسب مراجعة

## الخلاصات
- اكتب جملة تعريف للمراجعة: ما الذي يشمله وما الذي لا يشمله، ومتى تبدأ الجولة.
- سعّر الجولات الإضافية كبند مستقل (X لكل جولة إضافية)، وليس مفاجآت على أساس الوقت.
- حدد قاعدة العد: حلقة ملاحظات واحدة لكل تسليم، وأن موافقة المعلم (الميلستون) تُغلق الجولة.

## لماذا يجب أن تكون جولات المراجعة في العقد (لا في الدردشة فقط)

تفشل أعمال السعر الثابت غالبًا عندما تصبح كلمة “مراجعات” غير واضحة. طرف يرى أنها تعديلات بسيطة؛ والطرف الآخر يراها إعادة تفكير كاملة في الاتجاه. عندما لا يوجد نص في العقد، كل رسالة ملاحظات جديدة تتحول إلى مفاوضات.

العقد الجيد لا يقيّد العمل فقط؛ بل يضع طريقة عدّ مشتركة. تحدد ما الذي يشمله الاتفاق، وكم جولة مراجعة مضمونة، وماذا يحدث عندما يطلب العميل أكثر، وكيف يؤثر ذلك على السعر والوقت.

| البند في العقد | هدفك |
| --- | --- |
| تعريف المراجعة | اجعل “المراجعة” تعني نوعًا محددًا من التغييرات. |
| الجولات المضمونة | حدّد رقمًا يمكنك تقديمه ضمن السعر الثابت. |
| تسعير الجولة الإضافية | تجنب المفاجآت عند استمرار الملاحظات. |

## الخطوة 1: اختر قاعدة للعد (تسليم → ملاحظات → تعديل)

يجب أن تكون قاعدة العد بسيطة بحيث يطبقها الطرفان في الوقت الحقيقي. يفضّل كثير من المستقلين نموذج “دورة التسليم”: تقديم مسودة يفعّل نافذة ملاحظات واحدة. عند تسليم النسخة المعدلة، تُغلق تلك الدورة.

تجنب العدّ حسب عدد الرسائل أو التعليقات. العملاء يرسلون ملاحظات دفعات، ثم يعودون للمتابعة. إذا عدَدْت الرسائل، قد تُصبح الجولات الإضافية غير مقصودة وتتحول لخلاف حول الرسوم.

- استخدم جولة واحدة لكل دورة ملاحظات بعد كل تسليم.
- عرّف لحظة بداية الجولة (عند تسليم المسودة).
- عرّف لحظة انتهاء الجولة (عند تسليم المسودة المعدلة).

1. اختر وحدة العد: “جولة مراجعة واحدة = دورة ملاحظات واحدة لكل تسليم.”
2. اذكر الجولات المضمونة ضمن نطاق العمل (مثلًا: جولتَان لمسودة A).
3. اكتب جملة تفيد أن أي ملاحظات جديدة بعد تسليم النسخة المعدلة تبدأ جولة جديدة (وقد تُفوَتَر).

| الطريقة | كيف يتم العد | الأفضل لـ | ما خطر تجنبه |
| --- | --- | --- | --- |
| دورة التسليم | جولة واحدة لكل تسليم مسودة + ملاحظات العميل. | معظم مهام التصميم والكتابة بسعر ثابت. | العد حسب الرسائل قد يولد جولات إضافية بالخطأ. |
| لكل مخرَج | الجولات تُعاد لكل مخرَج مستقل. | مشاريع فيها عدة مخرجات مستقلة. | قد يتوقع العملاء تغييرات غير محدودة بين المخرجات. |
| لكل معلم (ميلستون) | الجولات ترتبط بخطوات موافقة (مسودة → تعديل → نهائي). | تنفيذ معقد مع نقاط موافقة. | إن كانت المعالم غير محددة، تصبح الموافقات ذاتية. |

## الخطوة 2: قرر ما الذي يُحسب “مراجعة” وما الذي لا يُحسب

قد يطلب العملاء اتجاهًا جديدًا بينما يظنون أنه ما زال ضمن المراجعة. احمِ السعر الثابت عبر فصل ثلاث مجموعات: مراجعة، توضيح ضمن النطاق، وتغيير خارج النطاق.

عمليًا، عرّف المراجعة كتغييرات تبقى ضمن نفس الأهداف ونفس المخرج ونفس المحتوى المتفق عليه. وعَرِّف التغيير خارج النطاق كتغييرات تضيف مخرجات جديدة، أو تغيّر نوع المخرج، أو تغيّر المتطلبات بعد الموافقة، أو تتطلب إعادة عمل كبيرة بسبب علامات تجارية جديدة أو قيود تقنية جديدة أو افتراضات جمهور جديدة.

- مراجعة ضمنية: تعديل الخط، إعادة صياغة نص ضمن نفس الهيكل، تعديلات تخطيط ضمن نفس الصفحات.
- توضيح: تجيب عن أسئلة لم تكن واضحة، وتوثق ذلك كملاحظة نطاق.
- خارج النطاق: ميزة جديدة، عدد صفحات جديد، متطلبات محتوى مختلفة، أو نوع مخرج مختلف.

1. اكتب جملة واحدة تُعرّف “المراجعة” وجملة واحدة تُعرّف “التغيير خارج النطاق.”
2. اجعل التعريفات قصيرة وقابلة للاختبار: على العميل أن يستطيع تطبيقها على طلبه.

| نوع الطلب | يُحسب كـ | كيف يتم الفوترة | أثره على الوقت |
| --- | --- | --- | --- |
| تعديلات بسيطة على التصميم | مراجعة | ضمن الجولات المضمونة (أو يُفوَتر إذا كانت جولة إضافية). | يُطبق ضمن وقت إنجاز المراجعة. |
| إصلاح أصل ناقص أو نص ناقص | توضيح ضمن النطاق | مضمن إذا قدّم العميل كل ما يلزم؛ وإلا يُتعامل معه كاعتماد تسليم. | يعتمد على وقت وصول الأصل/النص. |
| صفحة جديدة، قالب جديد، ميزة جديدة | تغيير خارج النطاق | يتم تقديره بشكل منفصل وإضافته على السعر. | قد يغيّر تاريخ التسليم حسب حجم النطاق والمراجعات. |

## الخطوة 3: تسعير الجولات الإضافية بدون إضعاف السعر الثابت

تريد أن يشعر العميل بأن الحد عادل، وأن تحافظ أنت على التحكم بالجهد. أنظف نهج هو: (1) تضمين عدد محدد من جولات المراجعة ضمن السعر الثابت، ثم (2) تسعير أي جولات إضافية بمبلغ لكل جولة.

اذكر سعر الجولة الإضافية بشكل واضح، واربطه بقاعدة العد التي اخترتها سابقًا. واذكر أيضًا أن التغييرات خارج النطاق ليست “جولات إضافية”—بل تقدير منفصل.

- ضمن السعر: “جولتَا مراجعة ضمن السعر الثابت.”
- سعّر الإضافي: “الجولات الإضافية تُفوَتر بـ X لكل جولة.”
- اربِطها بالدورة: “تبدأ الجولة الجديدة بعد تسليم النسخة المعدلة.”

1. حدّد X بناءً على وقتك المعتاد لكل دورة مراجعة، مع مراجعتك وتصحيحك وفحص الجودة.
2. اكتب البند بحيث يستطيع العميل توقع التكلفة بعد الموافقة، لا أثناء الخلاف.

| الخيار | قاعدة التسعير | درجة الوضوح | متى يناسب |
| --- | --- | --- | --- |
| لكل جولة إضافية | X لكل جولة مراجعة إضافية. | عالية (توقعها سهل). | التصميم وتحرير النصوص وتكرارات التخطيط. |
| بالساعة بعد الجولات المضمونة | وقت يُفوَتر بسعرك بعد استهلاك الجولات المضمونة. | متوسطة (متغيرات أكثر). | عندما تختلف التعقيدات كثيرًا بين المراجعات. |
| سقف ثابت للإضافي | تُفوَتر الجولات الإضافية حتى سقف محدد، ثم تقدير جديد. | عالية (تحمي الطرفين). | عندما لا يكون العميل متأكدًا لكن يريد ضبط التكلفة. |

## الخطوة 4: اكتب بند “جولات المراجعة” الذي يمكنك نسخه في العقد

فيما يلي هيكل بند جاهز للنسخ. استخدمه كقالب: احتفظ بالأجزاء التي يمكنك الدفاع عنها (قاعدة العد، الجولات المضمونة، تسعير الإضافي، فصل خارج النطاق).

إذا كنت تستخدم Qufy، يمكنك الحفاظ على اتساق شروط العقد عبر المشاريع عبر تعبئة حقول المراجعة نفسها في كل مرة. هذا يقلل الأخطاء ويجعل أسئلة العميل أقصر.

- التعريف: جملة واحدة لـ “مراجعة” وجملة واحدة لـ “تغيير خارج النطاق.”
- العد: عرّف دورة التسليم إلى تسليم النسخة المعدلة.
- الحدود: جولات مضمونة + ماذا يحدث بعدها (جولات إضافية مسعّرة).
- الوقت: اذكر أن الجولات الإضافية قد تؤثر على تاريخ التسليم.

1. عرض سعر → مراجعة العقد → رابط توقيع: أكد نطاق العمل وشروط المراجعة قبل بدء أي عمل.

| جزء البند | ماذا تكتب | نص مثال |
| --- | --- | --- |
| الجولات المضمونة | اذكر عدد الجولات المضمنة في السعر الثابت. | “تضمّن السعر الثابت جولتَي مراجعة لمسودّة 1 ومسودّة 2.” |
| قاعدة العد | اربِط جولة واحدة بدورة ملاحظات واحدة لكل تسليم. | “جولة المراجعة الواحدة تساوي دورة ملاحظات واحدة بعد كل تسليم.” |
| سعر الإضافي | حدد X لكل جولة إضافية واذكر أنها تُفوَتر بعد استهلاك الجولات المضمونة. | “الجولات الإضافية تُفوَتر بـ X لكل جولة.” |
| خارج النطاق | افصل التغييرات الكبيرة في النطاق عن جولات المراجعة. | “التغييرات خارج النطاق تحتاج تقديرًا جديدًا وقد تغيّر تواريخ التسليم.” |

## كيف تشرح حدود المراجعة قبل البدء (بدون نبرة قاسية)

أفضل وقت لمناقشة جولات المراجعة هو مرحلة الموافقة. استخدم كلمات تقلل القلق: أنت لا تقول “لا”، بل تقول “ضمن عملية محددة.”

نهج عملي: أرسل ملخص المراجعات مع عرض السعر، ثم اطلب تأكيدًا بنعم/لا. وعندما ترفق تفاصيل الدفع وتواريخ الاستحقاق لاحقًا في الفاتورة، يرى العميل أن المشروع يُدار كنظام.

- ابدأ بالجزء المضمن: “تملك جولتَي مراجعة ضمن السعر.”
- ثم وضّح الخطوة التالية: “الجولات الإضافية تُفوَتر لكل جولة بعد التسليمات.”
- وأخيرًا وضّح خارج النطاق: “المخرجات الجديدة تحتاج تقديرًا جديدًا.”

1. أرسل ملخصًا مناسبًا للواتساب لتأكيد طريقة المراجعة، ثم اجعل العقد هو المرجع.
2. بعد موافقة العميل، تتبع الوقت عبر مؤقت الويب أو مؤقت Mac فقط للحالات التي تنطبق فعلاً على الإضافي أو خارج النطاق.

| متى تُرسل | رسالة قصيرة |
| --- | --- |
| مع عرض السعر | “مضمن: جولتَا مراجعة. كل جولة = دورة ملاحظات واحدة بعد كل تسليم مسودة. الجولات الإضافية: X لكل جولة. المخرجات الجديدة: تقدير جديد.” |
| قبل بدء العمل مباشرة | “يرجى تأكيد طريقة المراجعة. بعد موافقة مسودة 1، سنبدأ وسنعد المراجعات حسب قاعدة الدورة.” |
| عند وصول ملاحظات إضافية | “شكرًا. هذا سيكون جولة مراجعة إضافية خارج الجولات المضمنة. أستطيع المتابعة بعد تأكيدك وموافقتك على التكلفة الإضافية.” |

## سير عمل عملي: عرض سعر → عقد → تسليم مسودات → عدّ الجولات

يمكنك تقليل الخلافات عبر إدارة المشروع كسلسلة موافقات. حدّد ما الذي يستلمه العميل في كل مسودة، وكيف ينبغي تجميع الملاحظات، وكيف ستسجل عدد الجولات.

عند استخدام ميزات Qufy للعقود، اجعل العقد مُوقّعًا عبر رابط، واعتمد بند المراجعة كمرجع. وعند إصدار الفواتير، اعرض تفاصيل الدفع وتواريخ الاستحقاق بناءً على ما يجيزه العقد (المبلغ الثابت + أي إضافي تمت الموافقة عليه).

- اجمع الملاحظات: اطلب من العميل إرسال قائمة ملاحظات موحدة لكل جولة.
- سجّل أي نسخة تمت الموافقة عليها: مسودة 1، مسودة 2، نهائي.
- عند الانتقال للإضافي، أكد ذلك كتابة ثم تابع.

1. عرض السعر: أدرج الجولات المضمونة وتسعير الإضافي في ملخص العرض.
2. العقد: وقّع نطاق العمل أولًا عبر رابط العقد (مع بند المراجعة).
3. المسودة 1: سلّم واطلب الملاحظات كقائمة موحدة.
4. العد: كل دورة ملاحظات على المسودة 1 تستهلك جولة من الجولات المضمنة (أو تبدأ جولة إضافية).
5. الفاتورة: أصدر الدفعة الخاصة بالسعر الثابت للمبلغ المتفق، ثم أضف الجولات الإضافية المعتمدة إن وجدت.

| المخرج | الجولات المضمونة | سعر الجولة الإضافية |
| --- | --- | --- |
| مفاهيم الشعار (مسودة 1–2) | جولتان | X لكل جولة إضافية |
| دليل استخدام الهوية (صفحة واحدة) | جولة واحدة | X لكل جولة إضافية |
| تخطيط الصفحة الرئيسية للموقع | جولتان | X لكل جولة إضافية |

## أخطاء شائعة عند عدم تحديد جولات المراجعة

إذا كان عقدك يكتفي بعبارة “X مراجعات” دون تعريف المراجعة أو طريقة العد، فسيفهم العملاء الكلمة بطرق مختلفة. قد تعمل دورات إضافية بينما يعتقد العميل أن كل شيء ما زال ضمن السعر.

تجنب كذلك المراجعات غير المحدودة في مشروع بسعر ثابت. يمكنك أن تكون مرنًا في النطاق، لكن السعر الثابت يحتاج حدودًا. الأفضل هو تقديم مسار واضح: جولات مضمونة الآن، ثم جولات إضافية مسعّرة بشفافية.

- خطأ: العد حسب الرسائل بدلًا من دورة التسليم.
- خطأ: اعتبار تغييرات خارج النطاق ضمن المراجعات المضمونة.
- خطأ: عدم ذكر أثر الجولات الإضافية على جدول الوقت.
- خطأ: تأجيل النقاش حتى بعد تنفيذ عدة جولات.

| مشكلة في الصياغة | حل أفضل في العقد |
| --- | --- |
| “مراجعات مضمونة” (بدون طريقة عد). | عرّف جولة المراجعة = دورة ملاحظات واحدة لكل تسليم. |
| “مراجعات غير محدودة” مع سعر ثابت. | استبدل ذلك بجولات مضمونة + جولات إضافية مسعّرة + تقديرات منفصلة خارج النطاق. |
| لا يوجد بيان حول تغيير تاريخ التسليم. | أضف: الجولات الإضافية قد تؤثر على تاريخ التسليم؛ وتوجد أيضًا التزامات اعتماد على المدخلات. |

## أسئلة

### كيف أحتسب جولات المراجعة في مشروع بسعر ثابت؟

اختر وحدة عد مرتبطة بالتسليمات: كل مرة تقدم فيها مسودة ويُرسل العميل ملاحظات، تكون تلك الدورة جولة مراجعة واحدة. بعد أن ترسل النسخة المُعدلة، تبدأ الجولة التالية عندما تُقدم ملاحظات جديدة على النسخة الجديدة.

### ما الذي يُحسب مراجعة مقابل طلب جديد؟

المراجعة عادة تعني تعديلات ضمن نطاق العمل نفسه والاتجاه نفسه الذي تمت الموافقة عليه. أما الطلب الجديد فهو عمل يغير الأهداف، أو يضيف مخرجات، أو يوسّع المنصات، أو يسبب إعادة عمل كبيرة بسبب متطلبات جديدة بعد الموافقة.

### كيف أسعّر الجولات الإضافية للمراجعة؟

استخدم سعرًا واضحًا لكل جولة إضافية (مثلاً “X لكل جولة مراجعة إضافية”) واذكر أنه يطبق بعد استهلاك الجولات المضمنة. وضّح أن الجولات الإضافية تخص المراجعات فقط، أما تغييرات خارج النطاق فتعالج ببند مستقل.

### هل أذكر جولات المراجعة لكل مخرَج أم للمشروع كله؟

إذا كانت المخرجات مستقلة (مثل اختلافات الشعار مقابل أقسام الموقع)، فذكر الجولات لكل مخرج يقلل الخلافات. إذا كان كل شيء ناتجًا واحدًا متماسكًا، فذكرها للمشروع كله أبسط—لكن مع تعريف التسليمات بوضوح.

### كيف أصيغ حدود المراجعة بطريقة يوافق عليها العملاء؟

قدّمها كعدالة وتوقعات واضحة: توفر عددًا معقولًا من الجولات، ثم تُسعّر الجولات الإضافية. أضف ملاحظة أنك تستطيع القيام بمراجعات غير محدودة ضمن نطاق العمل المتفق فقط إذا ظل العميل ضمن تعريف المراجعة وخضع للتوافق.

**استخدم قائمة عقد وبندًا يمكنك نسخه:** https://beta.qufy.app/contract

