Updated 16 October 2026
Quick decision frame before you calculate anything
A two-week brand job has one risk that repeatable pricing must handle: week 1 is where scope usually clarifies (or expands). If you only price “average production hours,” you can underquote immediately and still be working hard in days 3–7.
Your job is to choose a pricing model that matches how deliverables and feedback behave. Day rate works when outputs are defined and the workflow rhythm is stable. Hourly works when the client is still exploring, approving, or adjusting direction.
- If “done” is clear and revisions are limited → start with day rate.
- If deliverables are still fluid or approvals are delayed → start with hourly.
Pick the model based on what changes week 1
| What is uncertain | Best first week model |
|---|---|
| Exact deliverables (logos only vs full identity) | Hourly until deliverables lock |
| Feedback cadence and revision limits | Day rate with revision caps |
| Approval speed from decision-makers | Hourly or day rate with clear windows |
“A good quote protects week 1 from scope drift—and makes week 2 predictable.”
Why underquoting happens in week 1 (and how to stop it)
Week 1 contains hidden tasks you may not count when you estimate your “hourly rate.” These include client onboarding, reviewing brand references, setting up templates, organizing assets, preparing first drafts, and then doing the first meaningful revision after feedback returns.
Underquoting usually happens for one of three reasons: (1) you price only for production, not for waiting time and iteration; (2) you ignore revision rounds; or (3) you convert hourly to day rate with too few working hours per day.
A reliable fix is to add a week-1 buffer. That buffer can be time (extra hours you reserve) or scope (a limit you state clearly). You don’t need to overcomplicate it; you need to make the risk visible in your quote.
- Buffer with time: plan 1 extra review/iteration hour per week for setup + first feedback.
- Buffer with scope: cap revisions (e.g., 2 rounds) and define what counts as a revision.
- Write the week-1 assumption in one sentence (e.g., “Week 1 includes onboarding, first drafts, and 1 revision round”).
- Decide what happens if feedback arrives late (hourly continues, or day rate applies only during agreed feedback windows).
Three ways to price the week-1 risk
| Pricing choice | What it protects | How to phrase it to the client |
|---|---|---|
| Week-1 buffer hours (time) | Extra setup + first iteration | “Included: onboarding + first draft + 1 revision round in week 1.” |
| Revision caps (scope) | Feedback cycles that multiply | “2 rounds of revisions per deliverable; additional rounds are billed separately.” |
| Hourly fallback for unclear deliverables | Scope changes before direction locks | “Day rate applies once deliverables are confirmed; otherwise hourly until lock.” |
Day rate vs hourly: choose based on certainty and review cycles
Day rate is simple for clients: one number per workday. It also signals availability and continuity. But it only works well when you can define outputs and limit revisions—otherwise the day rate turns into an open-ended commitment.
Hourly is flexible and honest when you expect exploration. It is also safer when approvals are slow because you can still track your real time spent. The downside is that clients may ask for frequent updates and want you to “keep going” whenever they add tasks.
- Use day rate when: deliverables are listed, feedback rounds are agreed, and timing is stable.
- Use hourly when: deliverables, direction, or approval timing may change week 1.
- Draft your outputs list first (deliverables + file types + format expectations).
- Add a revision rule next (e.g., “2 rounds per deliverable, then hourly for additional rounds”).
- Now choose: day rate for stability, hourly for uncertainty.
Comparison you can apply to your next brand quote
| Factor | Day rate fits best | Hourly fits best |
|---|---|---|
| Deliverable list | Defined up front | Still being finalized |
| Revision rounds | Capped and agreed | Unclear or likely to change |
| Approval speed | Expected within set windows | May slip and cause idle time |
| Client add-ons | Handled as extras with clear pricing | Added tasks can be tracked |
How to compute a day rate from your hourly base (with a week-1 buffer)
If you already know your hourly base, a day rate is not “hourly × random hours.” You need a realistic number of billable hours per day and you need to account for setup and iteration. For a brand job, the non-creative time (brief review, asset prep, revision implementation) is real.
Start from your billable hours per workday (for example, 5 to 6 billable hours, depending on your workflow and how meetings are handled). Then add a week-1 buffer so that the first feedback cycle is not eating your margin.
- If the client insists on “7 full days,” ask how many are actually working days and how feedback windows are scheduled.
- Pick your billable hours/day based on how you work (and where meetings land).
- Run your hourly base through Qufy’s rate calculator to get a defendable number.
- Create a week-1 statement: what is included, what is capped, and what triggers extra billing.
Two-week pricing sanity check
| Question | If yes, you can use day rate |
|---|---|
| Are deliverables listed and prioritized? | You can cap revisions and define “done.” |
| Do you have a planned feedback cadence? | You can align day rate with work windows. |
| If feedback slips, does the contract allow hourly add-ons? | You won’t eat margin for delays. |
An ordered quote process you can reuse (quote → invoice → follow-up)
For a two-week brand job, speed matters—but only after your pricing logic is locked. The following sequence keeps week-1 risk visible and makes invoicing predictable.
- If the client requests a “discount” for committing to a fixed day rate, ask for revision caps and an explicit list of exclusions instead of reducing your base rate without boundaries.
- Collect a short brief: deliverables, target formats, and number of revision rounds you can commit to.
- Choose pricing model: day rate with revision caps for stable workflow, or hourly for fluid direction.
- Use Qufy rate calculator to generate one defensible number for your quote.
- Write the week-1 inclusion rule (one sentence) and the trigger for extra billing.
- Generate your invoice PDF using Qufy and show payment details tied to the chosen invoice structure.
- Set reminders and send them to the client when the due date approaches.
What to change depending on whether you quote day or hourly
| Item in your quote | Day rate version | Hourly version |
|---|---|---|
| Scope statement | Deliverables + revision cap define “done.” | Deliverables are working targets; time tracks real effort. |
| Client feedback windows | Aligned to days included in your rate. | Aligned to hours worked, even if feedback timing shifts. |
| How add-ons are priced | Extras priced per deliverable or per extra revision. | Added tasks billed at hourly, with a clear log rule. |
Use Qufy to keep your rate consistent across two weeks
A two-week project often means your work changes slightly day to day. Qufy helps you keep your pricing logic consistent by starting from a rate you can defend, then turning it into quotes and invoices with clear payment details.
You can also speed up quoting by starting with a WhatsApp brief, then refine deliverables and revision limits before you send the client your written quote.
- Rate calculator: set one defensible number you can explain in writing.
- Quotes and share links: send the offer quickly, then align deliverables and revisions before work starts.
- Invoices PDF: confirm payment details on the chosen invoice structure.
- Time tracking: track on the web or using the Mac timer so your week-1 buffer is grounded in real effort.
- If you chose day rate: define revision caps and exclusions, then invoice per your agreed schedule.
- If you chose hourly: track time during week 1 and confirm scope; invoice with payment details tied to tracked hours.
Checklist for a non-controversial 2-week scope (paste into your quote)
Before you pick day rate or hourly, make “done” measurable. The items below reduce debates during week 2 and protect your first-week margin.
- Deliverables: list them plainly (e.g., logo concepts, brand colors, social templates, style guide pages).
- Revisions: specify number of rounds per deliverable and what counts as a revision.
- Feedback windows: state when you expect feedback and how long you have to implement it.
- Exclusions: new direction changes, extra concepts, or additional formats beyond the agreed list.
- Payment schedule: due dates and what triggers the next invoice (midpoint deliverable, final delivery, etc.).
Clause snippets to prevent underquoting disputes
| Clause goal | Day rate wording | Hourly wording |
|---|---|---|
| Define week-1 scope | “Week 1 covers onboarding, first drafts, and 1 revision round.” | “Week 1 includes discovery and drafting; time is tracked until deliverables are confirmed.” |
| Handle extra revisions | “Additional revision rounds are billed as extras.” | “Additional changes are billed by the hour based on logged time.” |
| Manage unclear deliverables | “Day rate applies after deliverables are locked; before that, hourly may apply.” | “Deliverables evolve; pricing reflects time spent until approval milestones.” |
What to take away
- Convert your real weekly hours into a day rate (not a guess), then add a week-1 buffer for reviews.
- If the client is still defining deliverables, prefer hourly or a day rate with clear outputs and revision limits.
- Use Qufy’s rate calculator to produce one defensible number you can explain in writing.
Questions people ask
Should I quote a day rate or hourly for a two-week brand job?
Use a day rate when the deliverables and revision cycles are clear and the work rhythm is stable. Use hourly when the scope may change daily or the client is still defining what “done” looks like.
How do I avoid underquoting in the first week?
Price for the reality of kickoff: discovery, file setup, and the first round of feedback often take longer than your “average hour.” Add a week-1 buffer or choose an hourly structure until scope is confirmed.
What should I include in a day-rate quote for brand work?
Include the number of deliverables, the maximum revision rounds per deliverable, and the communication cadence (for example, one feedback window per day). Also specify what is excluded (new direction changes, extra concepts, extra file types).
When is hourly better than day rate for branding?
Hourly is better when you expect exploratory work, approvals that take time, or shifting priorities. It helps you keep the quote honest while the client locks in direction and the project scope stabilizes.
Can I quote a day rate and switch to hourly later?
Yes, if you write it as a clear condition. For example: day rate for week 1 to cover setup and first drafts, then hourly for add-ons or extra revisions after agreed deliverables are locked.